Skip to main content
615 Asphalt, asphalt paving in Nashville TN 615-431-3789

Parking Lots & Commercial Paving

Parking lot paving engineered for traffic, drainage and a clean first impression

We grade, build the base, pave and stripe your lot in phases that keep your business open and your customers parking.

Call or text today615-431-3789

Request a paving visit

Tell us about your project. We will contact you to confirm the details and set up a time to visit.

Or call 615-431-3789

By sending this you agree that we may contact you about your project. See our Privacy Policy.

Prefer to type? Text your request to 615-431-3789

Parking Lot Paving

A parking lot is part of your storefront. Customers judge a business by the lot they park in, and a lot with ponding water, potholes and faded stalls tells them the wrong story. A well-built lot starts with a base designed for the traffic it will carry and a grade that sends water to the drains.

We pave new parking lots for businesses in Nashville and across Middle Tennessee. We review the layout, prepare the subgrade and stone base, place asphalt at the right thickness for cars or trucks, roll it to a tight finish and coordinate striping, curbs and signage so the lot is ready to open.

What you get

Done right, from the first walk-through

01

Layout and traffic planning

Stalls, aisles and entrances arranged for easy flow.

02

Base for the load

Thickness and stone depth chosen for cars, delivery trucks or both.

03

Grade and drainage

Slopes that send water to inlets instead of ponding.

04

Striping and finishing

Fresh lines, curbs and details so the lot opens ready to use.

The process

How your service comes together

  1. 1

    Plan the lot

    We review the layout, traffic, drainage and phasing.

  2. 2

    Prepare and base

    Grade, correct the subgrade and compact the stone base.

  3. 3

    Pave and stripe

    Place and roll the asphalt, then add striping and details.

FAQ

Common questions about parking lot paving

Can you work while my business stays open?

Yes. We phase the work, block off one section at a time and keep entrances open wherever possible.

How thick should commercial asphalt be?

It depends on traffic. Car-only areas need less than delivery and truck lanes, and we design each part of the lot for its use.

When can customers drive on it?

Usually after the asphalt cools and is striped, often within hours or by the next day. We plan the schedule with you.

Let us help with your parking lot paving

Call, text or send the form. Tell us about your property, where it is and what the pavement needs, and we will take it from there.

615-431-3789Text