Skip to main content
615 Asphalt, asphalt paving in Nashville TN 615-431-3789

Milling, Base & Drainage

Asphalt milling that removes the worn surface and sets up a clean, level overlay

A milling machine grinds off the damaged top layer to a set depth so new asphalt can be placed at the correct grade, and the millings can be recycled.

Call or text today615-431-3789

Request a paving visit

Tell us about your project. We will contact you to confirm the details and set up a time to visit.

Or call 615-431-3789

By sending this you agree that we may contact you about your project. See our Privacy Policy.

Prefer to type? Text your request to 615-431-3789

Asphalt Milling

Milling removes the top layer of old asphalt without tearing out the whole pavement. It lets new asphalt be placed without raising the grade at curbs, doors, gutters and manholes, and it removes cracked, rutted or raveled surface material that would shorten an overlay's life.

We mill pavement for owners in Nashville and across Middle Tennessee. We set the depth to suit the project, mill smooth and even, haul or recycle the millings, clean the surface and prepare it for paving.

What you get

Done right, from the first walk-through

01

Controlled depth

Milled to match drains, curbs and doors.

02

Smooth, even cut

A clean surface for the new asphalt to bond to.

03

Millings recycled

Removed material reused where possible.

04

Ready for overlay

Surface cleaned and tacked before paving.

The process

How your service comes together

  1. 1

    Plan the depth

    We measure grades and mark the milling limits.

  2. 2

    Mill and haul

    Grind the surface and load millings for reuse.

  3. 3

    Clean and pave

    Sweep, tack and place the new asphalt.

FAQ

Common questions about asphalt milling

Why mill instead of just overlaying?

Milling keeps the finished grade where it was, which avoids problems at curbs, doors and drains, and removes failing surface material.

Can millings be reused?

Yes. Reclaimed asphalt is commonly recycled into new pavement or used as base material.

Can I drive on milled pavement?

Milled surfaces are rough, so we keep traffic off until the new layer is placed, usually within a day or two.

Let us help with your asphalt milling

Call, text or send the form. Tell us about your property, where it is and what the pavement needs, and we will take it from there.

615-431-3789Text