Skip to main content
615 Asphalt, asphalt paving in Nashville TN 615-431-3789

Driveways & Residential Paving

Driveway replacement that starts with removal and rebuilds from the base up

We remove the failed pavement, fix the base and drainage, then pave a new driveway that is built to last.

Call or text today615-431-3789

Request a paving visit

Tell us about your project. We will contact you to confirm the details and set up a time to visit.

Or call 615-431-3789

By sending this you agree that we may contact you about your project. See our Privacy Policy.

Prefer to type? Text your request to 615-431-3789

Driveway Replacement

Sometimes a driveway cannot be saved. Deep ruts, sunken sections, widespread alligator cracking and standing water point to base failure, and paving over them just hides the problem for a short time. The right fix is to remove the failed material and rebuild.

We replace driveways for homeowners in Nashville and across Middle Tennessee. We break out and haul away the old asphalt, inspect and correct the subgrade, rebuild the stone base with proper compaction and slope, then pave a fresh surface that is built to last.

What you get

Done right, from the first walk-through

01

Removal and haul-off

Old asphalt is broken out and taken away.

02

Subgrade and base fixes

Soft spots corrected and a new compacted stone base placed.

03

Drainage corrected

Slope and runoff improved so water does not return.

04

New asphalt surface

Hot mix laid, rolled and finished with clean edges.

The process

How your service comes together

  1. 1

    Evaluate and plan

    We look at why the driveway failed and plan the rebuild.

  2. 2

    Remove and rebuild

    Remove the old pavement and build a new base.

  3. 3

    Pave and finish

    Lay the new asphalt and finish the edges.

FAQ

Common questions about driveway replacement

Why can't my driveway just be overlaid?

An overlay only works over a stable base. If the base has failed, new asphalt over it will fail too, so we rebuild.

How long does a replacement take?

Most driveways take one to three days on site, depending on size, weather and how much base work is needed.

What happens to the old asphalt?

It is hauled away and, where possible, recycled into new pavement material.

Let us help with your driveway replacement

Call, text or send the form. Tell us about your property, where it is and what the pavement needs, and we will take it from there.

615-431-3789Text